Start before power is applied
Document polarity, expected resistance or shorts checks, supply limits, connector orientation, and the safe order for first power-up.
Separate manufacturing checks from product behavior
Continuity, opens, shorts, solder quality, programmed-device access, and functional behavior answer different questions. A single pass label should not hide which checks were actually performed.
Make the setup repeatable
Name the firmware, fixture, instruments, cables, loads, environmental condition, and test sequence needed to reproduce the observation.
Record exceptions
If a check cannot be completed, record why, what evidence is missing, and whether the limitation blocks release or only narrows confidence.
Working checklist
- Board revision
- Safe power limits
- Test setup
- Firmware version
- Input condition
- Expected result
- Recorded observation
- Pass or decision rule
- Exception handling
The final technical, sourcing, testing, timing, and handover requirements depend on the submitted project and responsible approvals.